United Utilities – South Egremont Borehole Scheme, Egremont, Cumbria
JP Whitter (Water Well Engineers) Ltd are pleased to announce the successful completion of the South Egremont Borehole Scheme. Five production boreholes were drilled for United Utilities, together with two observation boreholes. Drilling commenced with diameters upto 1200mm (48″) diameter, using temporary casings. The boreholes were 600mm (24″) finished diameter and to depths of upto […]