Borehole Decommissioning Works
Winwick Hospital – Warrington
Removal of borehole pumps and backfilling of boreholes to EA approval, and provide decommissioning reports.
Yorkshire Water – Eggborough
Removal of borehole pumps and backfilling of 2no. 400mm diameter boreholes to a depth of 120m to EA approval and provide decommissioning reports.
Yorkshire Water – Barnoldswick
Removal of borehole pumps and line shaft pumps from 2no. wells 120mm diameter to 30m and boreholes 400mm diameter to 150metres, decommissioned to EA approval and provide decommissioning reports.
Crayfern Homes – Portsmouth
Decommissioning of heavily artesian borehole 550mm diameter to a depth of 50 metres to EA approval, and provide decommissioning report to allow continuation of house building project on the site of the ex-laundry.
Cheetham Hill Construction – Trafford Park, Manchester
Locating of boreholes that supplied the GEC factory, decommissioning of 3no. 600mm diameters to 100m to EA approval, and provide decommissioning report to allow development of the site.