Chemical Company Grimsby
Rehabilitation of three existing water supply boreholes, including removal of existing borehole pumps and cleaning out the borehole to original drilled depths, and extensive cleaning of borehole. Re-installing existing borehole pumps.
Warrington Wolves The Halliwell Jones Stadium
Drilling of a borehole to 60m with a finished diameter of 300mm. Completion of constant rate test pumping of completed borehole. Installation of permanent pumping equipment. Abstraction licence application. Borehole drilled within the stadium on the edge of the pitch using Drilltech D25KW rotary drilling rig. Borehole required for use in the stadium and some pitch irrigation.
Mrs Kauffman, Accrington
Drilling of a 150mm finished diameter borehole to a depth of 60m. Installation of permanent pumping equipment and pressure cylinder system.

Smallbrook Lane, Leigh, Lancs.
WN7 5PZ
Tel: 01942 871900
Out of Hours: 01942 893660
Fax: 01942 896843
Email:
sally@waterwell-engineers.co.uk