JP Whitter Projects
Commercial/Industrial Boreholes
Process Company Liverpool
Borehole drilled to a finished diameter 350mm depth 100m. 21day constant rate test pumping of the borehole using data loggers installed in off site sources also. Permanent pump installed and abstraction licence application.
Slaughter House Bradford
Borehole finished diameter 300mm to a depth 185m, lined to 130m.
Leisure Park Norfolk
Borehole drilled to finished diameter 450mm depth 125m, associated permanent pumping equipment.
ICI Company Cheshire
Replacement borehole with a finished diameter 600mm to a depth of 150m. Carry out a constant rate test on the borehole using a 450m3/hr test pump installed on 250mm diameter flanged rising main. Completion of a 28day constant rate test pumping with 24hr monitoring. Supply and installation of permenant pumping equipment with invertor drive starter and control panel.
Severn Trent Water – Llandinam Mid Wales
Abstraction borehole with a finished diameter 610mm, constructed through sand and gravels to the full depth at 1200mm diameter followed by installation of a 610mm diameter stainless steel well screen and gravel pack. Carry out a 28 day constant rate test pumping at a rate of 250m3/hr with 24hr monitoring.
Royal Ordnance Factory Lancashire
Borehole drilled to a finished diameter of 500mm and to a depth 150m, with permanent pumping equipment and control panel with inverter drive. Abstraction licence application
Mersey Loop Drainage Tunnel Boreholes
Liverpool City Centre – Drilling of 6no. boreholes finished diameter 550mm, to depths between 80m and 120m on the streets of the city centre. Extensive test pumping carried out.
Coal Authority Bacup Lancashire
Deerplay, Bacup – finished diameter 600mm to a depth of 140m, 28day constant rate test pumping at a rate of 300m3/hr. Permanent pumping equipment installed.
NHS Hospital Lancashire
Borehole drilled to a finished diameter 400mm to a depth of 80m and installation of permanent pumping equipment. One of a series of boreholes on site used to supply the hospital which relies 100% on their borehole supplies.
HGV Washing Facility Cheshire
Borehole with a finished diameter 250mm depth 85m, permanent pumping equipment, abstraction licence application.
Leisure Facility Cheshire
2no. boreholes finished diameter 300mm depth 80m, extensive test pumping to the new boreholes and existing boreholes on site. Completion of abstraction licence applications.
Severn Trent Water – Manton
Production borehole drilled to a finished diameter of 1005mm and to a depth 85m. Completion of a 28day constant rate test pumping at a rate of 450m3/hour with 24hr monitoring.
Working Quarry North Wales
Borehole drilled to a finished diameter of 350mm and to a depth of 200m, permanent pumping equipment and pipe work installation.
Laundry Network Various Sites UK
Various sites through out the UK. Boreholes finished diameter between 250mm – 350mm. Permanent pumping equipment and abstraction licence applications.
Mitzvah under construction Manchester
Borehole drilled with a finished diameter of 300mm to a depth of 120m, lined to 60m with plastic casing. The borehole was constructed exactly to a specification adapted to the Jewish faith. No steel or welding carried out on these works. The borehole to be used to supply bathing water during the relgious ceremonies.
Warrington Wolves The Halliwell Jones Stadium
Drilling of a borehole to 60m with a finished diameter of 300mm. Completion of constant rate test pumping of completed borehole. Installation of permanent pumping equipment. Abstraction licence application. Borehole drilled within the stadium on the edge of the pitch using Drilltech D25KW rotary drilling rig. Borehole required for use in the stadium and some pitch irrigation.