Water Well Engineers
Water Well Engineers
 

Irrigation Boreholes -Sporting/Recreation Purposes

Premier League Football Club London - Home Ground

Irrigation borehole finished diameter 250mm depth 150m, permanent pumping equipment and pipe work infrastructure around the stadium.

.

Premier League Football Club London Training Ground

Irrigation borehole finished diameter 250mm depth 150m, permanent pumping equipment and storage tank and pipe work.

.

Premier League Football Club Greater Manchester

Irrigation borehole finished diameter 300mm depth 80m, all associated permanent pumping equipment, abstraction licence application

.

Racecourse and Golf Course Lancashire

3no. irrigation boreholes finished diameter 300mm depths 80 – 120m, all permanent pumping equipment and associated licence applications

.

Racecourse Lancashire

Irrigation borehole finished diameter 300mm depth 100m. Test pumping and abstraction licence application.

.

Large Shopping Complex Manchester

2no. boreholes drilled with a finished diameter 300mm depth 120m for irrigation of gardens. Installation of permanent pumping equipment and abstraction licence application.

.

Country Club & Hotel Cheshire

Finished diameter 250mm depth 80m for irrigation of golf course and lake top up. Installation of permanent pumping equipment, piping into existing storage tank. Abstraction licence application.

.

Country Club & Country Park Lanacashire

Borehole with finished diameter 250mm, to a depth 120m for irrigation of golf course. Test pumping on the borehole, permanent pumping equipment and abstraction licence application.

.

Local Authority Borehole Gardens & Fountains

Borehole finished diameter 350mm to 60m, installation of permanent pumping equipment. Borehole for irrigation of garden areas and fountains in city centre location.

.

Premier League Football Club Merseyside

Irrigation borehole finished diameter 300mm depth 100m, installation of permanent pumping equipment, head works, and abstraction licence application.

.
 Well Drillers Association
Recent Projects
Chemical Company Grimsby
Rehabilitation of three existing water supply boreholes, including removal of existing borehole pumps and cleaning out the borehole to original drilled depths, and extensive cleaning of borehole. Re-installing existing borehole pumps.
.
Warrington Wolves The Halliwell Jones Stadium
Drilling of a borehole to 60m with a finished diameter of 300mm. Completion of constant rate test pumping of completed borehole. Installation of permanent pumping equipment. Abstraction licence application. Borehole drilled within the stadium on the edge of the pitch using Drilltech D25KW rotary drilling rig. Borehole required for use in the stadium and some pitch irrigation.
.
Mrs Kauffman, Accrington
Drilling of a 150mm finished diameter borehole to a depth of 60m. Installation of permanent pumping equipment and pressure cylinder system.
.
JP Whitter
The Potteries Garage,
Smallbrook Lane, Leigh, Lancs.
WN7 5PZ

Tel: 01942 871900
Out of Hours: 01942 893660
Fax: 01942 896843
Email:
sally@waterwell-engineers.co.uk