JP Whitter Projects
Geothermal
Princess St - Manchester
2no. 450mm diameter boreholes depth 90m each, extensive test pump and re-charge testing carried out on the boreholes. Site constraints were extremely difficult being a city centre site, with limited space available to all contractors working on the site.
Manchester Civil Justice Centre - Manchester
Cleaning out of boreholes, drilling boreholes deeper. Completion of extensive test pumping and installing permanent pumping. Construction of various observation boreholes around the site 150mm diameter and installation of the permanent data logging instruments.
Edge Hill College - Ormskirk
2no. 400mm diameter boreholes to depths of 100m each. These boreholes formed part of the largest geothermal scheme in Europe. Each borehole test pumped with extensive monitoring carried out of other sources off site. Permanent pumping equipment installed in one borehole and the necessary pipe work installed in the second borehole to accept the discharged water after use.

Smallbrook Lane, Leigh, Lancs.
WN7 5PZ
Tel: 01942 871900
Out of Hours: 01942 893660
Fax: 01942 896843
Email:
sally@waterwell-engineers.co.uk